California’s grid operator is changing how energy developers can connect to the state’s electric grid. The California Independent System Operator (CAISO) voted to prioritize projects that are likeliest to be built and are located near transmission lines.
The change is intended to expedite interconnection of new renewable energy sources to the grid, allev…
Keep reading with a 7-day free trial
Subscribe to California Energy Journal to keep reading this post and get 7 days of free access to the full post archives.
